- Consolidation of the headquarters of this religious group included a new 24,000 SF headquarters building that included administrative and conference space and a day chapel.
- As general contractor, ThirdWall managed the entire site and building construction process.
- The exterior design blended with the surroundings and consisted of natural stone, precast and brick veneer plus a standing seam metal roof.
- Upgraded interior finishes touched off the new building and included wood trim details, millwork installations, custom wood ceilings, pendant light fixtures and designer flooring.
Challenges and Results
- Some design elements presented construction challenges. ThirdWall was able to provide solutions to:
- Properly seal the internal gutter system in a metal roof design
- Correctly apply natural stone veneer to the foundation to control water penetration
- Creatively divert water shedding away from the building foundations when a drainage system was not wanted